JSW Energy has operationalized a new wind blade manufacturing facility in Halol, Gujarat, with an annual capacity of 450 blades (approx. 600 MW). This move aims to strengthen the supply chain and reduce costs for its wind energy projects. The company targets a total power generation capacity of 30 GW and energy storage capacity of 40 GWh by 2030. Currently, JSW Energy manages a total lock-in capacity of 32.1 GW across thermal, hydro, and renewable sectors.
https://tv9gujarati.com/business/jsw-energy-wind-blade-manufacturing-plant-halol-gujarat-aims-achieve-30-gw-capacity-1461015.html #creator program


