Salal Hydro Project
Desilting Drive Begins
After the suspension of the Indus Waters Treaty
(IWT), India has initiated a major desilting and reservoir cleaning operation
at the 690 MW Salal Hydroelectric Power Station built on the Chenab River in
Reasi district of Jammu & Kashmir. The move is aimed at enhancing reservoir
capacity and optimizing water utilization rights. #28 फरवरी के अपडेट