MD, KRIDE along with Director (Projects& Planning), KRIDE, GC and contractors, today, inspected the station works and alignment along Corridor 2, Mallige Line of BSRP between Banaswadi and Kasturinagar.
MD inspected on foot a length of 3.200 km (i.e., from Ch. 4.000 to 0.980km). The stretch involved at-grade work construction of earthwork in embankment, ERS, Minor bridges & RUBs.
MD reviewed the feasibility of alignment & station locations. He also directed the officials to strictly adhere to the timelines. #kr #kride


